Rio Tinto project · Pilbara WA
Twin boom
stacker
Two 50 m³ concrete footings for a twin boom stacker project on a Rio Tinto site. Existing rail removed, upgraded footings installed, and rail reinstalled.
Port Hedland · Pilbara WA
A selection of documented work — concrete footings and site works, external concrete and drainage, and residential renovation.
Rio Tinto project · Pilbara WA
Two 50 m³ concrete footings for a twin boom stacker project on a Rio Tinto site. Existing rail removed, upgraded footings installed, and rail reinstalled.
AIE Engineering project · Port Hedland WA
Overgrown grass and existing pavers were removed and replaced with broom-finished concrete, including formed drainage channels to control surface water.
Residential renovation · Pilbara WA
Kitchen renovation with a new splashback and new window, and all windows throughout the home upgraded to square set — plus benchtops, cabinetry and a servery.
View project & photosResidential renovation · Pilbara WA
A flyover roof lined with shadow-gap plywood and recessed lighting, plus a laundry renovation with new cabinetry, timber benchtop and finishes.
View project & photosNew projects are added as they are documented. Have a similar job in mind? Send a quote enquiry
Client and project-site names and logos identify where work was carried out only. They do not imply endorsement or preferred-contractor status.
Port Hedland · Pilbara WA
Send a quote enquiry for concrete, formwork, renovations or maintenance — by email or through the enquiry form.